I never said IMEC tested for a week. We have had the wafer’s and setup on our test rig and start testing.
4DS have told us that it would take 3months to test the wafers.
Why would you call a trading halt if initial testing was good and the watch the SP go sky high and closer to the finish or after finishing testing and pumping up everyone’s expectations and then you find that with all the testing the metrics are not conforming to design metrics and basically ends up as a substandard development.
I do not see it as good news sorry.
- Forums
- ASX - By Stock
- Ann: Trading Halt
I never said IMEC tested for a week. We have had the wafer’s and...
-
- There are more pages in this discussion • 266 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Exploration drilling kicks off at Truncheon & Highway East, targeting copper-gold near historic mine
LU7
The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour
Add 4DS (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.003(3.49%) |
Mkt cap ! $146.3M |
Open | High | Low | Value | Volume |
8.4¢ | 8.8¢ | 8.1¢ | $302.9K | 3.609M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 624891 | 8.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 29598 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 624891 | 0.081 |
11 | 1083550 | 0.080 |
3 | 1006329 | 0.079 |
5 | 417001 | 0.078 |
2 | 61000 | 0.077 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 29598 | 1 |
0.084 | 200000 | 1 |
0.085 | 11000 | 1 |
0.086 | 10000 | 1 |
0.087 | 300000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
4DS (ASX) Chart |