IVZ 4.05% 7.1¢ invictus energy ltd

"If they have decided to drill the Lower Angwa as 6" hole and...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "If they have decided to drill the Lower Angwa as 6" hole and the Pebbly Arkose is included with the Forest and post Dande in 12.1/4 ' hole, then it will leave just the Upper Angwa for the 8.5" section. "

    I've never wireline logged a 6 or 6-1/2" hole without major issues. The smaller the hole the less clearance between borehole and tools and more likelihood of issues. If they haven't got the hole deterioration issues they had in M-1 fully resolved then logging a slim hole would be a suicide mission.

    A 6" hole would also require a full set of slimhole LWD tools as well.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.