Table below assumes that they get 90% of the value of the zircon in the zic pricing at 28%ZrO2
Table uses current production rate.
Does it cost more than $1m/yr to run the dry mill?
mothballing the msp might be an option that is being considered?
kcf
- Forums
- ASX - By Stock
- Ann: Trading Halt
Table below assumes that they get 90% of the value of the zircon...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable