By definition the term intermediate logging operation is used when there are more than one logging jobs in a well. Usually where there is an intermediate logging job there is usually a total of two logging jobs in the well but it's theoretically possible to have more than one intermediate logging job in a deep well or a well with sidetracks.
Technically M2_ST1 includes the original bore down to kick off point and then the sidetrack from there to TD. So in this case we have two intermediate logging jobs: 1) the first intermediate 12-1/4" hs logging job in original bore 2) upcoming second intermediate logging job in the sidetrack and I'm assuming 3) Final logging job at TD for the sidetrack.
- Forums
- ASX - By Stock
- IVZ
- Ann: Trading Halt
Ann: Trading Halt, page-264
-
-
- There are more pages in this discussion • 502 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $104.6M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.7¢ | $87.62K | 1.285M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 405865 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 639754 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 405865 | 0.067 |
5 | 362766 | 0.066 |
6 | 589319 | 0.065 |
4 | 488350 | 0.064 |
3 | 264618 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 639754 | 5 |
0.070 | 913194 | 7 |
0.071 | 1064037 | 10 |
0.072 | 1002000 | 8 |
0.074 | 242618 | 2 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |