Logging jobs can sometimes get pulled early if a well is close to planned TD and a downhole tool failure has triggered the need for a trip. If enough of the reservoir is opened up and priority is getting a sample from same that would provide an extra reason for an early logging job.
The use of the term "intermediate logging" suggests they plan to drill on after the logging job and conduct another logging job at 3400m.
- Forums
- ASX - By Stock
- Ann: Trading Halt
Logging jobs can sometimes get pulled early if a well is close...
-
-
- There are more pages in this discussion • 692 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.1¢ |
Change
-0.004(5.33%) |
Mkt cap ! $100.6M |
Open | High | Low | Value | Volume |
7.3¢ | 7.4¢ | 7.0¢ | $164.6K | 2.293M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 32787 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 600835 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 32787 | 0.071 |
5 | 1416070 | 0.070 |
2 | 134492 | 0.069 |
2 | 110000 | 0.068 |
2 | 148625 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.073 | 600835 | 2 |
0.074 | 570200 | 5 |
0.075 | 716858 | 6 |
0.076 | 690227 | 4 |
0.077 | 528285 | 3 |
Last trade - 16.10pm 17/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |