AMD 0.00% 0.3¢ arrow minerals ltd

Ann: Trading Halt, page-14

  1. 5,938 Posts.
    lightbulb Created with Sketch. 398
    With all the action going on over their and the new appointments this thing will take off (IMO). This from RIO a week ago -

    SYDNEY--(BUSINESS WIRE)-- Rio Tinto will provide an update today at its Investor Seminar on the world class Simandou iron ore project in Guinea, which is being progressed in partnership with CIOH, a Chinalco-led consortium, Winning Consortium Simandou1 (WCS), Baowu and the Republic of Guinea.
    Simandou is the world’s largest untapped high-grade iron ore deposit. The Simfer joint venture’s2 mine concession held an estimated Total Mineral Resource as at 31 December 2022 of 2.8 billion tonnes, of which Rio Tinto is today reporting the conversion of an estimated 1.5 billion tonnes to Ore Reserves that support a mine life of 26 years, with an average grade of 65.3% iron3 and low impurities. Rio Tinto is also reporting Mineral Resources exclusive of Ore Reserves of 1.4 billion tonnes at 66.1% Fe and low impurities.
    Rio Tinto estimates that its initial4 share of capital expenditure to develop the Simfer mine and the co-developed rail and port infrastructure project is approximately $6.2 billion5.
    Rio Tinto Executive Committee lead for Guinea and Copper Chief Executive Bold Baatar said: “We are continuing to work closely with the Government of Guinea, Chinalco, Baowu and WCS towards full sanction of this world class project by all partners.
    “Simandou will deliver a significant new source of high-grade iron ore that will strengthen Rio Tinto’s portfolio for the decarbonisation of the steel industry, along with trans-Guinean rail and port infrastructure that can make a significant contribution to the country’s economic development.”
    In what will be the largest greenfield integrated mine and infrastructure investment in Africa, more than 600 kilometres of new multi-use rail together with port facilities will be co-developed by the Republic of Guinea, Simfer and WCS. This will allow the export of up to 120 million tonnes per year of mined iron ore by Simfer and WCS from their respective Simandou mining concessions6 in the southeast of the country.7
    The co-developed infrastructure capacity and associated cost will be shared equally between Simfer, which will develop, own and operate a 60 million tonne per year8 mine in blocks 3 and 4 of the Simandou Project, and WCS, which is developing blocks 1 and 2.
    Under the co-development arrangement, Simfer and WCS will deliver separate infrastructure scopes to leverage expertise9. Simfer will construct the approximately 70 km Simfer spur rail line and a 60 million tonne per year transhipment vessel (TSV) port, while WCS will construct the dual track approximately 536 km main rail line, the approximately 16km WCS spur rail line and a 60 million tonne per year barge wharf.

    https://www.riotinto.com/en/news/releases/2023/simandou-iron-ore-project-update
 
watchlist Created with Sketch. Add AMD (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $31.61M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $116.5K 38.00M

Buyers (Bids)

No. Vol. Price($)
10 22335369 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 84829251 44
View Market Depth
Last trade - 16.10pm 01/08/2024 (20 minute delay) ?
AMD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.