EXR 4.23% 6.8¢ elixir energy limited

Ann: Trading Halt, page-22

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 774 Posts.
    lightbulb Created with Sketch. 747
    Suprised by the level of detail in the Trading Halt request!
    I think it's going to be good news.

    An announcement with regards to:

    Design: A gas explorer might change the design of a flow test during testing for several reasons

    • Unexpected Results: If the initial flow test results deviate significantly from expectations, such as lower flow rates or unexpected pressure behavior, the design may need adjustment to gather more accurate data or to understand the underlying geological conditions better.
    • Optimizing Production: Changes in the design may be aimed at optimizing production rates. For example, altering the choke size or tubing configuration could be done to achieve higher flow rates or to manage the well's production more efficiently.
    • Well Integrity Issues: If there are indications of well integrity issues, such as sand or water influx, the flow test design might be modified to address these issues and ensure accurate measurement of gas flow rates.
    • Equipment Limitations: Sometimes, the equipment used for flow testing may have limitations or encounter technical issues. Modifying the design can help work around these limitations or troubleshoot equipment problems.
    • Reservoir Behavior: As the flow test progresses and more data is collected, the understanding of reservoir behavior may evolve. Adjustments to the test design may be needed to account for new insights or to better characterize the reservoir.

    Timing: A gas explorer might change the timing of the flow test timeframe during testing for various reasons:

    • Reservoir Behavior: If the gas reservoir exhibits unexpected behavior, such as rapid pressure decline or variations in gas composition, the timing of the flow test may need adjustment to capture these changes accurately.
    • Well Stabilization: It's common to wait for a certain period after drilling or completing a well to allow for stabilization before conducting a flow test. If stabilization takes longer or shorter than anticipated, the timing of the flow test may be adjusted accordingly.
    • Weather or Environmental Factors: External factors such as weather conditions, seasonal variations, or environmental considerations (e.g., wildlife migration patterns) can influence the timing of flow tests. Changes in these factors may prompt adjustments to the test timeframe.
    • Operational Considerations: Operational constraints or scheduling conflicts with equipment, personnel, or other activities on the site can lead to changes in the timing of flow tests. Prioritizing safety, logistics, and efficiency may require shifting the test timeframe.
    • Data Collection Requirements: Depending on the data needed and the objectives of the flow test, the timing may be adjusted to ensure optimal data collection. For example, testing during certain production phases or at specific intervals may provide more valuable insights.
    • Unexpected Events: Unforeseen events such as equipment failures, personnel issues, or emergencies may disrupt the planned flow test timeframe, requiring rescheduling or modifications to the testing schedule.

    Intented outcomes: A gas explorer might change the intended outcomes of an appraisal well during a flow test for several reasons:

    • Reservoir Characteristics: The initial expectations regarding reservoir characteristics, such as gas composition, pressure, and flow rates, may not align with the actual findings during the flow test. Adjusting the intended outcomes can help better understand and characterize the reservoir.
    • Production Potential: If the flow test indicates a higher or lower production potential than anticipated, the intended outcomes may be revised to reflect these new insights. This could involve reassessing production targets or adjusting development plans accordingly.
    • Well Performance: Variations in well performance, such as unexpected pressure behavior, water or sand influx, or gas composition changes, may prompt a reassessment of the intended outcomes to account for these factors and optimize production strategies.
    • Technical Challenges: Technical challenges encountered during the flow test, such as equipment limitations, well integrity issues, or operational constraints, may necessitate changes in the intended outcomes to overcome these challenges and gather reliable data.
    • Economic Considerations: Changes in market conditions, gas prices, or cost estimates may influence the economic viability of the project. Adjusting the intended outcomes during the flow test can help align the project's objectives with current economic realities.
    • Data Quality and Interpretation: As more data is collected during the flow test, the quality of data and interpretation of results may improve. This could lead to refining or modifying the intended outcomes to incorporate new insights and improve decision-making.
    Last edited by BasVermeulen: 24/04/24
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
-0.003(4.23%)
Mkt cap ! $81.38M
Open High Low Value Volume
7.4¢ 7.4¢ 6.8¢ $499.0K 7.205M

Buyers (Bids)

No. Vol. Price($)
4 327748 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 161753 3
View Market Depth
Last trade - 16.10pm 14/10/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.