ARU 0.00% 15.5¢ arafura rare earths ltd

Ann: Trading Halt, page-71

  1. 6,366 Posts.
    lightbulb Created with Sketch. 1600
    Yes it was monadelphous cheers. My point being they are requiring the extra cash - not just Gina's 20 million - say 30-40 million combined (that would have been part of the total finance package anyway) to advance everything for immediate construction readiness outside of initial 50 million site works.

    Just a thought anyway and yes hysteria as we saw with that Dec SPP/CR top up which was to be sufficient to conclude financing and remains on track to do such. I just see they are after early contingency monies to have contractors and materials at the security gate awaiting entry on FID.
    Contractors required from additional security, medical officer, Dry mess - Wet mess contractors - social area/pool and gym/gardens built etc - through to bus contractors - small onsite civil team/machinery - workshop persons/supplies/spares - more early construction works - a large workshop/stores and lay down area needs to be built and fenced - Hard stand for water trucks current and future - Diesel quick fill and underground tanks - larger accommodation facilities commencement - vehicles of various requirements - some current roads require sealing etc etc 30-40 million does not go far in remote places. The current monthly cost is quiet substantial - insurance etc ridiculous - sitting on care and maintenance basically - the list is very extensive and it all adds up - some required sooner some later.

    Definitely the top 3 you mention in equity along with the other Insto that was there - has been all the way since Dec 22 large SPP. Is there product available or already designated to another offtaker providing equity? possible even if Siemens offtake - such will be demand as you state some offtakers will possibly be positioning themselves early for later supply increase on stage 2 delivery.
    Other Insto's - super funds (ARF and as advised those aligned to renewables - environment).
    It would not be out of the realms a large auto - US or EU perhaps. Hyundai/Kia certainly locked in substantial supply off takes early.
    US Gov - DOD - now relying on one as they have backed Lynas in is not a great strategy. LAMP! Texas plant insufficient supply - MP mess! they'll likely fix in one way or another.
 
watchlist Created with Sketch. Add ARU (ASX) to my watchlist
(20min delay)
Last
15.5¢
Change
0.000(0.00%)
Mkt cap ! $371.8M
Open High Low Value Volume
15.5¢ 16.0¢ 15.5¢ $446.2K 2.874M

Buyers (Bids)

No. Vol. Price($)
62 2695095 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 2036367 21
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
ARU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.