Slimes is effectively all the other matter within the deposit, ie. clay/mud. Ranobe would be like mining the beach.
You'd have a cost saving on processing and the type of tailings dam, how much? hard to know maybe somewhere between $20-$40m.
The biggest advantage is that your flow sheet is much simpler, far easier to wet and dry mill with no slimes.
P
- Forums
- ASX - By Stock
- BSE
- Ann: Transformational Acquisition of the Toliara Sands Project
Ann: Transformational Acquisition of the Toliara Sands Project, page-21
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)