Some background I found:
What is clear from some of the historical info is the problems of BMA related to:
- Attempt to high grade resource, which did not work (BMA mined 10 g/t Au not the 30 g/t they planned), they needed to have much higher grades as gold price was around A800/oz and ore was trucked about 300km to mill.
- Resource hangs together better at lower cut-off grades which is possible at current gold prices.
NQM looked at open pit mining and UG at 309 in 2009m before being taken over by Conquest (A$1500/oz)
https://www.asx.com.au/asxpdf/20091210/pdf/31mn9hm2xv8r93.pdf
Lone Sister info
https://www.asx.com.au/asxpdf/20100204/pdf/31njfcdn4y5qnr.pdf
Reserve Quoted at 309 (A$1500/oz)
https://www.asx.com.au/asxpdf/20100413/pdf/31pr98fpkbdkj2.pdfMore light reading
https://www.asx.com.au/asxpdf/20081222/pdf/31f9wt6swm5kp6.pdf
- Forums
- ASX - By Stock
- GBZ
- Ann: Transformational Acquisition of Twin Hills Gold Project
Ann: Transformational Acquisition of Twin Hills Gold Project, page-32
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.41M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.9¢ | $1.575K | 175K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 3434520 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 258868 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 3434520 | 0.008 |
5 | 2100000 | 0.007 |
1 | 250000 | 0.006 |
3 | 2370000 | 0.005 |
1 | 500000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 258868 | 1 |
0.010 | 1609449 | 5 |
0.011 | 655299 | 2 |
0.012 | 1160798 | 5 |
0.013 | 1322442 | 3 |
Last trade - 10.20am 31/07/2024 (20 minute delay) ? |
Featured News
GBZ (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online