the part of the trident scoping study about the hydrology of the mine is a good read imo. Tridentt got an aquifer running on shear zone. Trident needs 2 to 7 liter per second of pumping to keep her dry assuming that no stope accidently cut aquifer causing mine flood out and no water run back down the drillhole after you pull the bit out because you done cut the aquifer by accident with the jumbo. Interesting that Barrick owned trident for 10 years and never mucked it to feed hungry mills at plutonic.
- Forums
- ASX - By Stock
- Ann: Trident scoping study demonstrates Plutonic's potential
the part of the trident scoping study about the hydrology of the...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.67 |
Change
-0.140(4.98%) |
Mkt cap ! $602.8M |
Open | High | Low | Value | Volume |
$2.80 | $2.85 | $2.51 | $2.465M | 922.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | $2.66 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.69 | 16000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 2.660 |
1 | 2328 | 2.620 |
1 | 9578 | 2.610 |
3 | 18000 | 2.600 |
1 | 1000 | 2.570 |
Price($) | Vol. | No. |
---|---|---|
2.690 | 16000 | 1 |
2.700 | 5000 | 1 |
2.710 | 3432 | 1 |
2.720 | 3432 | 1 |
2.730 | 3432 | 1 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
CYL (ASX) Chart |