CRR 9.09% 1.2¢ critical resources limited

Ann: Tshimpala Project - RC Drilling Update, page-3

  1. 9,500 Posts.
    lightbulb Created with Sketch. 2859
    Very shallow drilling for the most part - like in DRC.
    Samples being sent to testing - later, and next year - .....like in DRC Results in 4-5 months - after rainy season and backlogs and...and...?
    But perhaps most importantly....
    How are they going to mine lead through a river canyon in a populated area without poisoning the locals? confused.png
    Check the crowds watching them drill....probably why the project was unloved before JB came along.
 
watchlist Created with Sketch. Add CRR (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $21.33M
Open High Low Value Volume
1.1¢ 1.2¢ 1.1¢ $5.661K 512.0K

Buyers (Bids)

No. Vol. Price($)
11 3006774 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 3110132 8
View Market Depth
Last trade - 16.10pm 30/05/2024 (20 minute delay) ?
Last
1.1¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
1.1¢ 1.2¢ 1.1¢ 1057816
Last updated 15.39pm 30/05/2024 ?
CRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.