Jupiter Mines announced that the concept study into the expansion of the Tshipi Borwa Manganese Mine has been completed. A comprehensive feasibility study will commence shortly. The feasibility study will be based on a production profile of 4.5Mt a 50% increase on the current 3Mt production level. Production profiles in excess of the Base Case Scenario were explored as part of the concept study, however the infrastructure required is less complex, will involve a shorter timeframe to implement, has a lower capital requirement, there is less reliance on road transport and the legal requirements are more favourable from a timing perspective for the Base Case Scenario.
- Forums
- ASX - By Stock
- Ann: Tshipi Completes Expansion Concept Study
Jupiter Mines announced that the concept study into the...
-
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JMS (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $441.1M |
Open | High | Low | Value | Volume |
22.5¢ | 23.0¢ | 22.0¢ | $615.1K | 2.726M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 17204 | 22.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 93952 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 17204 | 0.220 |
2 | 149280 | 0.215 |
11 | 369769 | 0.210 |
8 | 2854000 | 0.205 |
10 | 4255476 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 93952 | 4 |
0.230 | 792421 | 6 |
0.235 | 79000 | 1 |
0.240 | 552311 | 6 |
0.245 | 63000 | 2 |
Last trade - 16.10pm 08/08/2024 (20 minute delay) ? |
Featured News
JMS (ASX) Chart |