Share
1,624 Posts.
lightbulb Created with Sketch. 8
clock Created with Sketch.
10/10/16
10:23
Share
Originally posted by binwood
↑
Amazing results.
The 100g/t metres kind of skew things. If you use the calculator JID showed us all a while back and take the 100g/t sections out those 40g/t intersections provide somewhere around 3g/t for the rest of the intersection. In saying that we have crazy high gold patches and the rest of the intersection is still double our current reserve grade.
I will be really surprised if we aren't seeing a mining plan feeding the mill 2g/t+ average within the next 6 to 12 months. That makes a huge difference to BDR. If we can produce an extra 50k ounces plus a year with no change in costs just by getting grade up that will get our AISC sub $700 (especially with mains power thrown in). It is why I will probably hold despite a currently weak POG. BDR is on it's way to being a mid tier all weather (literally and in terms of POG) miner.
Expand
Good to see the old iron ore holes are being resampled and coming up with new lodes.
This is a serious gold update.