The well has been drilled as planned to a total depth of 5,710 feet (1737 m). Multiple, potential sandstone gas reservoirs are indicated based on interpretation of drill cuttings, gas shows and wireline log data. Pancontinental considers the sands penetrated are at least as good as expected pre drill. Current operations are running 7 inch production casing, protecting the indicated gas zones for later testing. Once casing has been run, the well will be suspended and the Ensign Rig 587 demobilised from site. PCL said "at least as good as expected", to me that's as expected is minimum
- Forums
- ASX - By Stock
- Ann: Tulainyo Gas Project Update
The well has been drilled as planned to a total depth of 5,710...
-
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GFS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online