not sure. There is a Rugby presentation on their website from sometime in July. At that stage they had only drilled six short holes so that suggested the info in their presentation was out of date, or they had experienced some problems or delays in the drilling campaign. Or indeed found something exciting that needed some time out to redesign the drill program. Who knows, but it does suggest results may be delayed from public release a bit longer than originally planned.
- Forums
- ASX - By Stock
- Ann: Turner River Base Metals Project Update
Featured News
Add DEG (ASX) to my watchlist
|
|||||
Last
$1.14 |
Change
0.050(4.59%) |
Mkt cap ! $2.732B |
Open | High | Low | Value | Volume |
$1.12 | $1.15 | $1.10 | $13.39M | 11.83M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 380096 | $1.14 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.15 | 204419 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 42659 | 1.140 |
1 | 13312 | 1.135 |
5 | 20121 | 1.130 |
2 | 33312 | 1.125 |
4 | 31512 | 1.120 |
Price($) | Vol. | No. |
---|---|---|
1.150 | 23712 | 3 |
1.155 | 30482 | 3 |
1.160 | 24812 | 4 |
1.165 | 23312 | 2 |
1.170 | 17166 | 3 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
DEG (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online