AYN 0.00% 0.1¢ alcyone resources ltd

re: Ann: Twin Hills Operations and Production... Patience is...

  1. 205 Posts.
    re: Ann: Twin Hills Operations and Production... Patience is needed. Stack the third heap, irrigate and in 6 or so weeks we are in full production. Ramp up means that. Irrigation takes its time and the more rain means dilution to the cynide which may mean more treating. We cant control the weather and I would not suggest building a massive roof over the heaps. 3100 oz per day has been achieved with 2 pads, and over 4000 oz once the 3rd comes on line. Cant be too dissappointed.

    Just wondering if production is a 7 day a week rate? At 15-20 dollars per oz(prod costs) the numbers are starting to look really nice imo. Just hope the rain stays away, pos continues north, aussie $ continues south, exploration keeps giving great results etc etc.

    Good luck to all
 
watchlist Created with Sketch. Add AYN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.