@eastwest101
I doubt that the WME drilling is in the right location. In the JORC tables, WME effectively said "we know where it is on surface" and "we believe it is near vertical". In spite of the above the WME holes are plotted such that not one of them intersects the vertical projection of the surface expression. The hole collars can no longer be found in the field.
The drilling of last year and this year has only been located by hand-held GPS. It is clear that holes 201, 202 and 203 were drilled too far south and didn't hit the mineralised zone. However all of them would have hit the zone of mineralisation below today's 'fault' as they all ended north of the collar of 301.
As for the drill holes which are the focus of today's release:
A week ago I queried the collar coordinates and hole orientations- they were wrong and I was emailed the 'correct' data:
Drill Order
SiteID
Easting (GDA94)
Northing (GDA94)
Collar (mAHD)
Total Depth (m)
Grid Azimuth (deg)
Dip (from hor.)
Drilling Days
Notes
1 1
BO_315RC
335413
7880315
159.4
80
328.0
-57.8
3.0
201RC (previously 50m)
2 2
BO_316RC
335423
7880298
159.0
155
349.3
-71.9
1.5
202RC (previously 82m)
3 3
BO_317RC
335394
7880291
157.8
125
339.0
-61.0
2.0
306RC (previously 107m)
4 Hitch 2 (Progress to 14th July)
Drill Order
Site ID
Easting (GDA94)
Northing (GDA94)
Collar (mAHD)
Total Depth (m)
Grid Azimuth (deg)
Dip (from hor.)
Drilling Days
Notes
1 4
BO_318RC
335432
7880284
158.8
203
333
-73
1.5
203RC (previously 103m)
Today's release has the following:
You can see that 315 has a different bearing and 316 has a different dip.
A quick look at Figure 3, the section in today's release shows that neither 315 nor 316 is plotted at the dip shown in Figure A1. Hole 301 was drilled at about 60 degrees. Holes 315 and 316 are plotted at 78 degrees. A little bit of Pythagorus puts 301 and 315 collars 14m apart but here they are plotted 26m apart. Hole 316 is also appears to be incorrectly located on the section.
Why do they keep pushing this halo zone? 100ppm and 1500ppm are not going to make anyone any money.
44m x 1.19% - 14m x 3.55% = 30m @ 0.09%, 900ppm PAYDIRT!!!!
- Forums
- ASX - By Stock
- CCZ
- Ann: Up to 9% Copper in Big One Deposit Assays
Ann: Up to 9% Copper in Big One Deposit Assays, page-15
-
-
- There are more pages in this discussion • 71 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(10.0%) |
Mkt cap ! $5.847M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $26.50K | 5.309M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 3698623 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 1640396 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 3698623 | 0.004 |
19 | 12630700 | 0.003 |
15 | 11902011 | 0.002 |
13 | 14753004 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1640396 | 2 |
0.006 | 3360019 | 5 |
0.007 | 537153 | 4 |
0.008 | 1425757 | 7 |
0.009 | 497508 | 1 |
Last trade - 15.57pm 27/09/2024 (20 minute delay) ? |
Featured News
CCZ (ASX) Chart |