re: Ann: Update Las Lagunas Gold and Silver P... After re-reading the announcement, several times, I get the impression that MBL were on site during the review of operations. And since everybody seems to be of the opinion that things "should" be able to run to design, I would be fairly confident that the loan payment terms can be extended.
The last thing MBL would want is for PGI to end up in administration. They want their loan repaid. And they want to be able to get cheap gold (via the hedge), especially if they're of the opinion that the gold bull is still in play.
- Forums
- ASX - By Stock
- AAU
- Ann: Update Las Lagunas Gold and Silver Project
Ann: Update Las Lagunas Gold and Silver Project , page-2
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $5.567M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $19.61K | 5.404M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
67 | 58100281 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 5120114 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
57 | 42743378 | 0.003 |
44 | 63998402 | 0.002 |
15 | 64479950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 5120114 | 5 |
0.005 | 16499453 | 16 |
0.006 | 10267660 | 11 |
0.007 | 14470314 | 8 |
0.008 | 16601000 | 7 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online