An interesting update today and it would appear there may finally be some light at the end of this long tunnel.
This update does blur the outcome. It is not clear if it is:
A - PF deal with Equity; or
B - Equity only finance solution for the SA1 and VIC1 (to start) and then PF to come in later (portfolio basis) once these two projects are through construction.
On either A or B above, DEL will have to give something up, so interested to see what % of Free Carry they would have in the SA1 and VIC1 SPV entities after finance process has been completed. DEL currently have 90% of the VIC1 SPV, not 100% (free carry retained by the landholder), so this is also a residual point to remember.
- Forums
- ASX - By Stock
- Ann: Update on Bioenergy Infrastructure Project Finance
An interesting update today and it would appear there may...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.119M |
Open | High | Low | Value | Volume |
3.2¢ | 3.5¢ | 3.2¢ | $10.31K | 305.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 61376 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.6¢ | 4025 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 61376 | 0.032 |
4 | 254552 | 0.030 |
1 | 25000 | 0.028 |
1 | 260000 | 0.026 |
1 | 250000 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 4025 | 1 |
0.038 | 155474 | 6 |
0.040 | 9419 | 2 |
0.043 | 600931 | 1 |
0.044 | 147910 | 1 |
Last trade - 15.47pm 28/06/2024 (20 minute delay) ? |
Featured News
DEL (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online