i seriously doubt that they are following engineers drawings for that slab. I cant see any tie down bolts for the plant. The individual modules should be elevated above the slab on concrete to allow zero contact between standing water and the steal. An engineer would tell you exactly where the tie down bolts go, and if you drill and grout the bolts in after (because you dont know where they go), that's a sign of rank amateurism.
I can imagine in their hast to show some progress, a few months down the track, they'll leave out the bolts altogether and have various items of plant tethered by rope to the roo bars of some utes or loaders to stop it bouncing down towards Ravensthorpe.
- Forums
- ASX - By Stock
- CLZ
- Ann: Update On Construction At Kat Gap
Ann: Update On Construction At Kat Gap, page-24
-
-
- There are more pages in this discussion • 299 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLZ (ASX) to my watchlist
|
|||||
Last
0.1¢ |
Change
-0.001(50.0%) |
Mkt cap ! $756K |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.1¢ | $9.588K | 6.011M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
137 | 323771597 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 62926441 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
132 | 319421597 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 62425448 | 9 |
0.003 | 21566438 | 13 |
0.004 | 3335000 | 6 |
0.005 | 2885561 | 5 |
0.006 | 311200 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
CLZ (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online