tie down bolts could be chemset in after the cold joint in the middle of the slab thoe ????
- Forums
- ASX - By Stock
- CLZ
- Ann: Update On Construction At Kat Gap
Ann: Update On Construction At Kat Gap, page-26
-
-
- There are more pages in this discussion • 297 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.253M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1.115K | 1.115M |
Featured News
CLZ (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online