From JPR press releases, it looks like they have well by well infrastructure to utilize the gas (on site power and local use) and then have a larger and more permanent path to moving gas to MMG at the North Akkar field to the west.
The take away for me, is that the gas will be fully utilized now and with additional production wells, and this allows oil production at optimal levels.
From the Feb 2024 Corporate Presentation
- Stage 1 GasUtilisation infrastructure in place and allowing 5 production wells to operate at optimal levels.
- Stage 2 GasUtilisation will commence building in 1H 2024 (including power lines and gas pipelines)and will integrate into adjoining neighbour (MMG) infrastructure.
- Government approvals inplace as well as agreements with MMG in relation to the gas utilization integration.
- Forums
- ASX - By Stock
- Ann: Update on development of L-T gas utilisation infrastructure
From JPR press releases, it looks like they have well by well...
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.7¢ |
Change
0.002(8.00%) |
Mkt cap ! $34.41M |
Open | High | Low | Value | Volume |
2.7¢ | 2.7¢ | 2.7¢ | $7.84K | 290.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 236425 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 136416 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 236425 | 0.025 |
2 | 134311 | 0.022 |
1 | 25000 | 0.020 |
3 | 264889 | 0.016 |
1 | 10000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 136416 | 1 |
0.039 | 444000 | 1 |
0.045 | 22675 | 1 |
0.050 | 170000 | 1 |
0.055 | 35000 | 1 |
Last trade - 10.04am 04/10/2024 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |