Hi Tony, I believe the company should continually review the roles of senior executives, whether they are still required, performance and suitability and bang for buck.
For example if you had a CEO that was a geologist and you moved to a battery manufacturing strategy after plan e failed/not likely to happen, would the CEO be the right man for the job. Frankly, probably not.
So yes KNL should continually monitor this and its good you have raised it.
- Forums
- ASX - By Stock
- EGR
- Ann: Update on Epanko Graphite Project and Pilot Plant Strategy
Ann: Update on Epanko Graphite Project and Pilot Plant Strategy, page-84
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGR (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.4¢ |
Change
-0.004(4.08%) |
Mkt cap ! $42.67M |
Open | High | Low | Value | Volume |
9.6¢ | 9.9¢ | 9.3¢ | $26.37K | 275.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 27151 | 9.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.7¢ | 338382 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 27151 | 0.092 |
4 | 60064 | 0.091 |
4 | 55702 | 0.090 |
1 | 10000 | 0.086 |
2 | 37358 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.097 | 338382 | 1 |
0.099 | 10000 | 1 |
0.100 | 829704 | 4 |
0.105 | 315397 | 1 |
0.110 | 54365 | 3 |
Last trade - 15.57pm 27/09/2024 (20 minute delay) ? |
Featured News
EGR (ASX) Chart |