Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.
- Forums
- ASX - By Stock
- KGL
- Ann: Update on Feasibility Study of Jervois Copper Project
Ann: Update on Feasibility Study of Jervois Copper Project, page-16
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
-0.001(1.04%) |
Mkt cap ! $61.57M |
Open | High | Low | Value | Volume |
9.6¢ | 9.8¢ | 9.5¢ | $22.84K | 237.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 15946 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 41965 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 15946 | 0.095 |
1 | 100000 | 0.093 |
2 | 110761 | 0.092 |
1 | 92088 | 0.091 |
1 | 26000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 41965 | 1 |
0.105 | 25000 | 1 |
0.110 | 45864 | 3 |
0.115 | 100000 | 1 |
0.120 | 736648 | 6 |
Last trade - 13.43pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
KGL (ASX) Chart |