Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.
- Forums
- ASX - By Stock
- KGL
- Ann: Update on Feasibility Study of Jervois Copper Project
Ann: Update on Feasibility Study of Jervois Copper Project, page-16
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.72M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 10.0¢ | $1.12K | 11.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 80236 | 9.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 14657 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 80236 | 0.097 |
4 | 111833 | 0.096 |
3 | 144900 | 0.095 |
1 | 60000 | 0.094 |
1 | 100000 | 0.092 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 14657 | 1 |
0.105 | 40756 | 5 |
0.110 | 64706 | 2 |
0.115 | 13690 | 2 |
0.120 | 317648 | 2 |
Last trade - 10.18am 01/08/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online