Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.
- Forums
- ASX - By Stock
- Ann: Update on Feasibility Study of Jervois Copper Project
Have a read of the PFS...
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.009(9.38%) |
Mkt cap ! $68.05M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 10.0¢ | $12.02K | 115.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 28818 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 99999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 28818 | 0.105 |
1 | 80000 | 0.098 |
2 | 18600 | 0.096 |
1 | 31578 | 0.095 |
1 | 106000 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 99999 | 1 |
0.120 | 809368 | 8 |
0.140 | 28000 | 1 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 15.42pm 08/11/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online