Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.
- Forums
- ASX - By Stock
- Ann: Update on Feasibility Study of Jervois Copper Project
Have a read of the PFS...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
-0.005(4.17%) |
Mkt cap ! $65.23M |
Open | High | Low | Value | Volume |
11.5¢ | 11.5¢ | 11.5¢ | $20.31K | 176.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 148072 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 17632 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 148072 | 0.115 |
5 | 298875 | 0.110 |
4 | 264757 | 0.105 |
5 | 337420 | 0.100 |
2 | 33152 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 17632 | 2 |
0.125 | 90147 | 4 |
0.130 | 50000 | 1 |
0.135 | 816666 | 2 |
0.140 | 280252 | 4 |
Last trade - 15.15pm 10/05/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |