KGL 4.35% 12.0¢ kgl resources limited

Ann: Update on Feasibility Study of Jervois Copper Project, page-16

  1. 1,668 Posts.
    lightbulb Created with Sketch. 286


    Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.






 
watchlist Created with Sketch. Add KGL (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
0.005(4.35%)
Mkt cap ! $68.07M
Open High Low Value Volume
12.0¢ 12.0¢ 12.0¢ $4.236K 35.3K

Buyers (Bids)

No. Vol. Price($)
5 90371 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 17200 1
View Market Depth
Last trade - 10.09am 24/05/2024 (20 minute delay) ?
KGL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.