It definitely was a Clayton's report but what else do we expect from them. It is same old same old. So I will remain confident and say that the update for May will be much better based on the next 8000plus tons still to be reported on. It's time for this stock to take off.
- Forums
- ASX - By Stock
- SVG
- Ann: Update on Gold Production from Agate Creek Gold Project
Ann: Update on Gold Production from Agate Creek Gold Project, page-16
-
-
- There are more pages in this discussion • 99 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SVG (ASX) Chart |
Day chart unavailable