Strange things started to happen after our most recently appointed director - Mr Peter Wright sold down.
The directors selling window opened opened on the day the recent 1/4erly was released - 01 May 2019. It is open for 30days.
Directors have 14days to advise the ASX of any change to their holdings.
By not reporting any significant change, perhaps the other boys can join the pillage.
It’s only a rort if you’re not in on it!
- Forums
- ASX - By Stock
- SVG
- Ann: Update on Gold Production from Agate Creek Gold Project
Ann: Update on Gold Production from Agate Creek Gold Project, page-17
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
SVG (ASX) Chart |
Day chart unavailable