"That means Hammer Mill concept works and they are getting 6.4g/ton and this is only Tailings.''
Yes I think the hammer mill system is working far betetr.. however - No - not tailings .. tailings is waste product produced after already having been process - this is mixed - tailings, low grade, medium grade developement material. So the tailings portion has been processed once (badly ) by the last bod.. plus a mix from low and medium grades.. not JUSt tailings.
I wouldnt mind knowing when they will be doing a tailings run via HM3 and what the result is as well.
- Forums
- ASX - By Stock
- OGX
- Ann: Update on Hammer Mill 3 Commissioning
Ann: Update on Hammer Mill 3 Commissioning, page-111
-
- There are more pages in this discussion • 151 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online