We should see lot bigger volumes put through with a new LHD (Load, Haul Dump machine) see quote
"Level 5 Mestre was reached on 10 April with a vein
that appears to range between 0.5 and 2.5 metres (see Map 1 and Photos 6, 7 and 8). So far, we have
mined 25 metres of this lode. Hammer Mill 2 processed four tonnes of this material last week and returned
an average grade of 26.41 g/t gold doré. A new LHD arriving before end April will assist in moving this
material to surface for processing by HM3."