what is their throughput. the size matters. a plant that is 52ktpa of input REMC is bigger than what hastings and makango are planning. My next prediction is that the PM8 number will decrease (REMC input) from the 52ktpa
They will high grade the REMC, to reduce the size of the plant in order to limit capex values. However this sort of thinking won't really come out until detailed studies are completed.