Hi Potchip.
There hasn't been anyone to engage with,
Getting back to your question, the production at Torming has significantly improved even with the dramas they have had with processing.
If you compare the June QTR's production (Yellow) vs the 6 months production from the first half 2023 (Blue).
MRC managed to process nearly as much material in 3 months as it did for 6 months the year prior.
The contained HMC was also much better than previous QTR's production,
A basic calculations, MRC processed around US$8.6mil worth of HMC for the QTR. At the annual rate this would have achieved US$34mil
As you can see, even at these levels of production (Excluding the graphite business Approx annual revenues US $7.2mil) MRC annual production was set to be significantly higher than 2023 revenues and trending back toward the higher levels for 2023.
- Forums
- ASX - By Stock
- MRC
- Ann: Update on Mineral Commodities Ltd
Ann: Update on Mineral Commodities Ltd, page-3
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online