As a result, the scoping study projects an extremely robust, low cost and high margin mine. The mine design is considered low risk due to it having being previously mined and currently similarly designed with relatively shallow pits. Substantial upside exists for extended mine life and increased monthly productivity from currently defined resources and potential exploration upside.