@kynrazor ....."I’va had the help of my old mate engineers with prior experience in Africa so I have a very good idea what the processing costs will be in the DRC pound for pound. "
LOL, yet look at all the TUs you get for a ridiculous statement.
In WA there are many gold mines/operations all over the place, same for nickel mines, yet every single one of them has had feasibility studies done on them, they don't just guess because the one up the road seems to work OK, nor base a new operation on 'others' costs.
Like I stated amateur hour if you think they know how profitable or not this operation will be before doing the study!!
The reason is obvious to those that think about it. Every single ore-body is slightly different, so grind sizes, reagent use, time in leach etc is different, so they study it all at the lab scale first as part of the feasibility, work out how expensive to grind to the best size for recovery (and profitability), likewise for reagents, time leaching etc.
BTW as it looks like you forgot, the plant is 175,000t/a according to the independent report, not 250,000t/a.
- Forums
- ASX - By Stock
- Ann: Update on Status of Re-Compliance Listing
@kynrazor ....."I’va had the help of my old mate engineers with...
-
- There are more pages in this discussion • 658 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WFE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online