Highlights
• Beijing General Research Institute of Mining and Metallurgy
(BGRIMM) has commenced an update of the Kebigada deposit DRC
Feasibility Study. The DRC Feasibility Study is expected to be
completed by January 2021.
• The updated DRC FS will incorporate the current Kebigada Mineral
Resource Estimate of 4.1Moz Au (0.5g/t Au cut-off grade), which is
substantially larger than the Kebigada maiden resource estimate of
2.1Moz Au (0.9g/t Au cut-off grade) which was utilized in previous
studies.
• A multi-purpose diamond core drill rig has been mobilized to Giro
camp, has been serviced and is ready for use. Amani plans to
complete 200m spaced drilling north and south of drillholes
GRDD034 and GRDD035 at Kebigada. The planned drilling campaign
will involve 4 core holes for a total of 2,000m and is expected to
commence in early 2021. Previous planned drilling campaigns have
been delayed due to the availability of diamond core drill rigs in
DRC because of border crossing closures (COVID-19 related
closures).
Highlights • Beijing General Research Institute of Mining and...
Add to My Watchlist
What is My Watchlist?