Highlights • Beijing General Research Institute of Mining and...

  1. 26,713 Posts.
    lightbulb Created with Sketch. 1336
    Highlights
    • Beijing General Research Institute of Mining and Metallurgy
    (BGRIMM) has commenced an update of the Kebigada deposit DRC
    Feasibility Study. The DRC Feasibility Study is expected to be
    completed by January 2021.
    • The updated DRC FS will incorporate the current Kebigada Mineral
    Resource Estimate of 4.1Moz Au (0.5g/t Au cut-off grade), which is
    substantially larger than the Kebigada maiden resource estimate of
    2.1Moz Au (0.9g/t Au cut-off grade) which was utilized in previous
    studies.
    • A multi-purpose diamond core drill rig has been mobilized to Giro
    camp, has been serviced and is ready for use. Amani plans to
    complete 200m spaced drilling north and south of drillholes
    GRDD034 and GRDD035 at Kebigada. The planned drilling campaign
    will involve 4 core holes for a total of 2,000m and is expected to
    commence in early 2021. Previous planned drilling campaigns have
    been delayed due to the availability of diamond core drill rigs in
    DRC because of border crossing closures (COVID-19 related
    closures).
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.