Tietto Managing Director and CEO Matt Wilcox said: “We are pleased to finalise this
updated Life of Mine Plan for our Abujar Gold Mine as we continue to ramp up gold
production. The updated LOMP shows AISC of US$982/oz over the life of the mine, and
strong average nine-year production of 170,000oz per year at a life of mine head grade of
1.04 grams per tonne gold.
- Forums
- ASX - By Stock
- TIE
- Ann: Updated Life of Mine Plan for Abujar Gold Mine
Ann: Updated Life of Mine Plan for Abujar Gold Mine, page-2
-
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TIE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online