11k produced again in September with all the rain fall. I was expecting 8-8.5k so this is definitely a lot better than expected. This is starting to look like it’s turning around. The Grade control drilling should help a lot in 4th quarter stockpiling and selective blending.
long term FCF of 171MM is extremely constructive for a 320MM market cap producer.
- Forums
- ASX - By Stock
- TIE
- Ann: Updated Life of Mine Plan for Abujar Gold Mine
Ann: Updated Life of Mine Plan for Abujar Gold Mine, page-3
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)