“The lower strip ratio resulting from the increase in ore mined over the optimised mine plan, coupled with lower LOM cost assumptions, is expected to have a positive impact on the optimised DFS to be completed next month which will greatly assist our discussions with prospective financiers.”
Another tick for finance.
Add to My Watchlist
What is My Watchlist?