“The lower strip ratio resulting from the increase in ore mined over the optimised mine plan, coupled with lower LOM cost assumptions, is expected to have a positive impact on the optimised DFS to be completed next month which will greatly assist our discussions with prospective financiers.”
Another tick for finance.