![https://hotcopper.com.au/data/attachments/3207/3207579-dfcfe73ec1adf2ab626f71acdc6506db.jpg](https://hotcopper.com.au/data/attachments/3207/3207579-dfcfe73ec1adf2ab626f71acdc6506db.jpg)
My Ignorance ? Or your blindness ?
AVZ stated they would be upgrading 10.8Mt of "Waste" from inferred to indicated. Instead the company only upgraded 3Mt
![wink.png](https://hotcopper.com.au/images/smilies/wink.png)
Instead AVZ downgraded 7Mt of material from Measured to Indicated (What a laughing stock). They downgraded twice as much material as what got upgraded
The happy brigade is bum slapping and high fiving, when really this announcement couldn't be any worse