Just goes to show dont rely on me for maths.
Out in a good way. My calculation for ceasium formate was 190 tonnes per annum.
May have been working off 5,000 tonnes of hydroxide instead of 5,600tonnes.
In this case happy to be wrong.
- Forums
- ASX - By Stock
- Ann: Updated Mineral Resource Estimates for Helikon 1 and Rubicon
Just goes to show dont rely on me for maths.Out in a good way....
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(33.3%) |
Mkt cap ! $15.27M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $2.692K | 1.101M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
143 | 193811100 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 30760326 | 30 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
139 | 187949305 | 0.002 |
51 | 222131035 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 30100326 | 28 |
0.004 | 40919241 | 43 |
0.005 | 12834841 | 14 |
0.006 | 11266864 | 14 |
0.007 | 6666991 | 8 |
Last trade - 16.10pm 10/05/2024 (20 minute delay) ? |
|
|||||
Last
0.3¢ |
  |
Change
-0.001 ( 16.7 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.3¢ | 0.3¢ | 2396807 | ||
Last updated 15.11pm 10/05/2024 ? |
Featured News
LPD (ASX) Chart |