NPF drilling will add the underground layer to the resource size in time.
Looks like the permissions for other target drilling are through as well. A1 should be a good target based on the 2018 initial drill results by MOD Resources and AEM results.
"In addition to targeting high-grade vein systems, most holes in the current program will be extended to intersect the NPF contact. The objective is to scope out the extent of NPF contact mineralisation below the A4 Dome and identify areas with higher copper-silver grades to focus future drilling. Drilling is also planned to commence at other high priority targets within 30km of the Motheo Copper Mine during the September 2021 Quarter. Targets include the large A1 Dome located 25km along strike from A4 and the T1 and T2 East prospects located 10km north of A1"
- Forums
- ASX - By Stock
- SFR
- Ann: Updated Mineral Resource for A4 Copper-Silver Deposit
Ann: Updated Mineral Resource for A4 Copper-Silver Deposit, page-12
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$10.84 |
Change
0.160(1.50%) |
Mkt cap ! $4.958B |
Open | High | Low | Value | Volume |
$10.79 | $11.02 | $10.70 | $30.33M | 2.797M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 250 | $10.72 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$10.84 | 46143 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 250 | 10.720 |
1 | 46143 | 10.710 |
3 | 11947 | 10.700 |
2 | 17310 | 10.690 |
3 | 3019 | 10.680 |
Price($) | Vol. | No. |
---|---|---|
10.840 | 46143 | 1 |
10.850 | 11548 | 4 |
10.870 | 15000 | 1 |
10.880 | 511 | 1 |
10.940 | 550 | 1 |
Last trade - 16.10pm 30/09/2024 (20 minute delay) ? |
Featured News
SFR (ASX) Chart |