* The Iron Valley Project is currently operational with TMM at 14Mtpa (wet) and scheduled to increase to 33Mtpa (wet) in 2018. Additional mining equipment of similar class to the existing fleet will be required and is planned for TMM increases from current levels.
mac, 33 Mtpa is 4 times the current level which means its 4 times the royalty?
So why is the SP not moving (or going backwards)?
Cheers.
- Forums
- ASX - By Stock
- BCI
- Ann: Updated Mineral Resources and Ore Reserves
Ann: Updated Mineral Resources and Ore Reserves, page-15
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCI (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
-0.005(2.22%) |
Mkt cap ! $634.5M |
Open | High | Low | Value | Volume |
23.0¢ | 23.0¢ | 22.0¢ | $1.106M | 4.915M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 176953 | 22.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 40304 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 176953 | 0.220 |
8 | 604801 | 0.215 |
4 | 171432 | 0.210 |
4 | 296692 | 0.205 |
6 | 121650 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 40304 | 1 |
0.230 | 50000 | 1 |
0.235 | 166267 | 7 |
0.240 | 163346 | 4 |
0.245 | 276416 | 9 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
BCI (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online