    I thought it would be an interesting time to update the NPV and IRR of the Nifty project as per the parameters on the restart study released 11/3/22

    In this study they gave sensitivities to the NPV and IRR for the change in copper price and the change in FX

    Below is the current case for NPV and IRR for Nifty. Please keep in mind this study was "phase 1" oxide only, which only included 10% of the MRE which at the time was 732,000 kg of copper metal. Now the resource is 1,000,000 kg of copper, hence that figure is now 7.3 %

    I understand the current management are doing studies on a larger, longer life, oxide and sulphide operation.

    The below analysis shows:

    The NPV7 of Nifty phase 1 (oxide only) utilising only 7.3% of its resource is $477m with today's copper price and FX.

    The IRR of Nifty phase 1 (oxide only) utilising only 7.3% of its resource is 62% with today's copper price and FX.

    Food for thought with CYM having a current market cap of only $38m.

    GLTAH
    https://hotcopper.com.au/data/attachments/6104/6104857-b2d19d5228fa81792ff13398a59a517e.jpg
 
watchlist Created with Sketch. Add CYM (ASX) to my watchlist
(20min delay)
Last
4.1¢
Change
0.003(7.89%)
Mkt cap ! $62.51M
Open High Low Value Volume
4.0¢ 4.3¢ 3.9¢ $585.8K 14.26M

Buyers (Bids)

No. Vol. Price($)
3 382362 4.0¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 945729 9
View Market Depth
Last trade - 16.10pm 02/05/2024 (20 minute delay) ?
Last
4.0¢
  Change
0.003 ( 5.54 %)
Open High Low Volume
4.1¢ 4.3¢ 3.9¢ 6048258
Last updated 15.59pm 02/05/2024 ?
CYM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.