TOE 0.00% 35.0¢ toro energy limited

Ann: Updated Scoping Study Results Lake Maitland Uranium Project, page-146

  1. 1,353 Posts.
    lightbulb Created with Sketch. 239
    Maybe his wife is a big holder or kids. Not enough to draw attention, but enough to be a lot without drawing attention.
    For tax reasons and privacy, people do make those sort of arrangements.

    Hes a lawyer and an accountant. He would know the most favourable way to structure ownership.

    A great person to have in charge at a time like this. IMHO.
    all I have said before so I expect the usual shotgun spray..
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
(20min delay)
Last
35.0¢
Change
0.000(0.00%)
Mkt cap ! $42.09M
Open High Low Value Volume
35.5¢ 35.5¢ 33.5¢ $43.81K 127.2K

Buyers (Bids)

No. Vol. Price($)
2 26880 33.0¢
 

Sellers (Offers)

Price($) Vol. No.
35.0¢ 18529 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.