TOE 1.43% 35.5¢ toro energy limited

Ann: Updated Scoping Study Results Lake Maitland Uranium Project, page-2

  1. 290 Posts.
    lightbulb Created with Sketch. 53
    I thought it would be a $1bn project with the updated scoping study

    Either way, not far off, long life, low cost. World class

    Ridiculous mcap
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
(20min delay)
Last
35.5¢
Change
0.005(1.43%)
Mkt cap ! $42.7M
Open High Low Value Volume
34.0¢ 35.5¢ 34.0¢ $48.79K 140.5K

Buyers (Bids)

No. Vol. Price($)
1 18285 35.0¢
 

Sellers (Offers)

Price($) Vol. No.
35.5¢ 99379 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.